SADBHIN vs TECHNOE: Stock Comparison
Sadbhav Infrastructure Project Limited vs Techno Electric & Engineering Company Ltd
Live data: 11 June 2026, 4:08 PM IST • Source: NSE and company filings
Techno Electric & Engineering Company Ltd is the larger company by market capitalisation. Sadbhav Infrastructure Project Limited shows a lower P/E, while Techno Electric & Engineering Company Ltd shows a higher dividend yield, faster revenue growth and a higher ROCE. These are relative readings on individual metrics — weigh valuation against growth, margins, leverage and capital efficiency rather than treating any single number as decisive.
Side-by-side comparison of Sadbhav Infrastructure Project Limited and Techno Electric & Engineering Company Ltd on live price, valuation, growth, profitability, leverage and quarterly shareholding. Highlighted values mark the more favourable of the two on that metric's usual reading; a single metric is never the full story.
Key Differences
Each difference is a single, relative reading — StockeZee does not name an overall winner.
Profile
| Metric | SADBHIN | TECHNOE |
|---|---|---|
| Sector | Construction | Construction |
| Industry | Civil Construction | Civil Construction |
Price
| Metric | SADBHIN | TECHNOE |
|---|---|---|
| Live Price | ₹3.01 | ₹980.3 |
| Day Change | -4.75% | 1.35% |
| Volume | 2.54 L | 1.97 L |
| 52-Week High | ₹5.02 | ₹1,575 |
| 52-Week Low | ₹2.06 | ₹870 |
| Distance from 52W High | -40.04% | -37.76% |
Valuation
| Metric | SADBHIN | TECHNOE |
|---|---|---|
| Market Cap | ₹92 Cr | ₹11,364 Cr |
| P/E Ratio | -0.78x | 23.73x |
| P/B Ratio | -0.26x | 2.71x |
| EPS | ₹-1.98 | ₹40.8 |
| Book Value | ₹6.51 | ₹357 |
| Dividend Yield | 0% | 0.93% |
Growth
| Metric | SADBHIN | TECHNOE |
|---|---|---|
| Revenue Growth (TTM YoY) | 4.63% | 23.8% |
| EPS Growth (TTM YoY) | 0% | -14.9% |
| Qtr Sales Growth | 11.7% | 23.8% |
| Qtr Profit Growth | 158% | -15% |
Profitability & Leverage
| Metric | SADBHIN | TECHNOE |
|---|---|---|
| ROE | — | 11.4% |
| ROCE | 14% | 14.8% |
| Net Margin | 5.82% | 14.57% |
| Operating Margin | 42.08% | 14.2% |
| Debt to Equity | — | 0.02x |
Shareholding
As of Jun 2026 • change vs previous quarter| Metric | SADBHIN | TECHNOE |
|---|---|---|
| Promoter Holding | 70.25% | 56.92% |
| FII Holding | 0% | 8.08%▼ 0.57 pp |
| DII Holding | 0% | 21.6%▼ 1.12 pp |
| Public Holding | 29.75% | 13.39%▲ 1.68 pp |
How to Read This Comparison
Valuation ratios (P/E, P/B) use the latest consolidated figures where available; growth numbers compare against the same period last year; shareholding percentages come from the most recent quarterly filings, with the change shown against the prior quarter. A "more favourable" highlight is relative between these two companies only — it is not a rating, a recommendation, or a comparison against the wider sector. Rows with no reported data for either company are hidden rather than shown empty.
Deep-dive each company on its stock page for quarterly results, technicals, filings and the full peer set: Sadbhav Infrastructure Project Limited and Techno Electric & Engineering Company Ltd.
Related Comparisons
Data source: NSE and company filings via StockeZee. This comparison is informational — it is not investment advice, and StockeZee is not a SEBI-registered investment adviser.

