
Mainboard IPO
Jindal Supreme (India) IPO
Prices in INR · Times in IST
GMP updated: 23 Sep 2026, 08:24 AM IST
- Price band
- ₹88 – ₹93
- Application estimate
- ₹14,9731 lot(s) · 161 sh
- GMP · unofficial
- ₹29 (+31.18%)
- Est. listing price
- ₹122Issue price + GMP
- Issue size
- ₹124.88 Cr
- Total subscription
- 181.07×
GMP trend & intraday history
Hover or tap on the chart to inspect a reading. Dates use calendar spacing; large gaps are not connected.
- High in this view
- ₹30 (₹4,830)
- Low in this view
- ₹11 (₹1,771)
- Reference issue price
- ₹93
- Readings in this view
- 15
- Subject to sauda
- 3500 / 49000
Issue at a glance
IPO timetable & schedule
Subscription by investor category
Source updated: 23 Sep 2026, 06:30 PM IST
Overall Demand: 181.07×Mainboard figures are consolidated. NSE and BSE demand is not added together. Rupee demand is calculated from bid shares and the cap price; it is not an exchange-published amount. Application source: boa.
QIB funding cost illustration
Arithmetic for a fully funded institutional bid over 7 days; not a recommendation or a retail return estimate.
- Days
- 7
- Interest Rate
- Not published
- Cost Per Share
- 11756.13
Day-wise subscription history
One snapshot near each bidding day’s close. This is not a continuous intraday series.
Plan your application
Estimate uses the published lot size and upper price band. Confirm your category and the offer terms before applying.
One lot: ₹14,973 · Allocation is not guaranteed. Broker cut-off times may differ.
Source-published application tiers
Before you place an IPO application
- Read the issue. Check the offer document, business risks, price band and your application category.
- Apply through your broker or bank. Use your existing broker’s IPO section or your bank’s ASBA facility. This page does not submit a bid.
- Check the payment step. If using UPI, confirm the mandate in your UPI app and check that the funds are blocked. A saved bid alone is not confirmation.
- Track what happens next. Keep your application number. Use the registrar’s official page for allotment and the published timeline for refunds, demat credit and listing.
GMP return scenario
What could this amount look like?
GMP-based scenario · Not a forecast
Assumes all requested shares are allotted and listing equals issue price + GMP. Actual allotment, listing price, fees and taxes can change the result.
Your IPO progress
Keep your own record of this IPO. Statuses are entered by you, not verified with a broker or registrar. Saved on this browser for your signed-in account; not synced across devices.
IPO reservation & shares offered
Shares offered by category
Category-wise allocation percentages follow SEBI ICDR norms as stated in the offer document.
Promoter holding & ownership
Abhishek Jindal and Sonam Jindal
Anchor investors & allocations
- Anchor entities
- 5
- Total allocation (₹ crore)
- 37.46
- Mutual fund allottees
- 0
- Official allocation document
- Anchor document: not published
Investor allocations
By fund house
Financials & valuation
Figures in Rs. Crore · Changes compare matching annual period-end dates only.
- Profit After Tax
- 8.28Latest: 30 Jun 2026Prior (31 Mar 2026): 22.53 · YoY unavailable
- EBITDA
- 13.76Latest: 30 Jun 2026Prior (31 Mar 2026): 41.63 · YoY unavailable
- Total Borrowing
- 92.46Latest: 30 Jun 2026Prior (31 Mar 2026): 119.87 · YoY unavailable
Rs. Crore
Key valuation & financial KPIs
- P/E Ratio
- 14.33
- EPS (₹)
- 6.49
- RoE
- 8.20%
- RoCE
- 6.14%
- RoNW
- 8.20%
- PAT Margin
- 4.33%
- EBITDA Margin
- 7.20%
- Debt / Equity
- 0.88
- NAV (₹)
- 26.07
What does the company do?
Jindal Supreme (India) Limited was started in March 1974. For more than five decades it has made and supplied steel pipes, tubes and related steel products used in infrastructure and industry. Its range covers mild steel black pipes and tubes, galvanized pipes, metal beam crash barriers and galvanized iron tubular poles. These are made in different sizes to Indian Standards and are used in water supply and plumbing, infrastructure and construction, roads and highways, bridges, oil and gas, chemicals, agriculture and rural electrification. The company has been adding new products to catch infrastructure demand. In FY2025 it started making W-beam and Thrie-beam metal crash barriers, which are the guard rails used along highways, and in FY2026 it added GI tubular poles used for street lighting and electrification work. It works mainly on a business to business basis, selling directly to institutional and industrial buyers including infrastructure contractors, and also through its dealer network. Its manufacturing facility is at Hisar in Haryana.
More about the business
Jindal Supreme (India) Limited has been making steel pipes and tubes since 1974, supplying MS black and galvanized pipes, metal beam crash barriers and GI tubular poles for infrastructure and industrial use. It manufactures from a single facility at Hisar in Haryana and sells directly to institutional buyers as well as through dealers.
Where will the money go?
Strengths & risks
Business strengths
- The company has a very long record, having been in this business since March 1974, which is more than 50 years.
- EBITDA improved sharply in FY2026, from Rs 25.92 crore to Rs 41.63 crore.
- It has added new products in each of the last two years, crash barriers in FY2025 and GI tubular poles in FY2026, both tied to highway and electrification spending.
- Net worth has almost doubled in two years, from Rs 50.31 crore in FY2024 to Rs 96.82 crore in FY2026.
- The issue is priced moderately at about 14.33 times earnings on an EPS of Rs 6.49.
- Its products go into many end uses, from water supply and highways to oil and gas and rural electrification, so demand is not tied to one sector.
- Rs 71 crore of the Rs 124.88 crore issue repays borrowings, which should reduce interest cost meaningfully.
- It sells both directly to institutional buyers and through a dealer network, which spreads the customer base.
Risks to understand
- Profit actually fell in FY2026, from Rs 24.27 crore to Rs 22.53 crore, even though income rose from Rs 604.74 crore to Rs 675.94 crore.
- Return ratios are weak. RoCE was only 6.14% and RoNW was 8.20%, which is low for a manufacturing business.
- Debt is high. Total borrowing was Rs 119.87 crore as on 31 March 2026 against a net worth of Rs 96.82 crore, and it went up from Rs 95.84 crore the year before.
- The profit margin is thin at 4.33%, so small changes in steel prices move the profit sharply.
- Sales are not growing steadily. Total income was Rs 650.88 crore in FY2024, fell to Rs 604.74 crore in FY2025 and then rose to Rs 675.94 crore in FY2026.
- The entire business runs from one facility at Hisar in Haryana, so any problem at that single location affects everything.
- The latest column in the offer document is only a three month period ending 30 June 2026, so it cannot be compared with the full years before it.
- This is a fresh issue combined with an offer for sale, and promoter holding falls from 100% to 73.68% after the issue.
Source-provided company information. Read the RHP for the complete risk factors; these points are not a recommendation.
Listing performance
Actual listing figures appear after listing. Current gain is source-adjusted for corporate actions. CMP is a source snapshot, not a streaming quote.
Official documents, registrar & contacts
Offer documents
Bigshare Services Private Limited
Phone: 8657578989/8069219065/8069219060
Email: ipo@bigshareonline.com
Allotment date: 21 Sep 2026
- •Sarthi Capital Advisors Pvt.Ltd.
9th KM, O P Jindal Marg, Hisar Cantt, Hisar, Haryana, 125006
Phone: 016 6223 6500
Email: janaksteel@gmail.com
Continue your IPO research
Explore more IPO companies
Related by issue type, with active issues first. These are research links, not investment recommendations.